To choose a Charge Point Operator (CPO) for duties including Location Survey & Identification, Planning, Supply, Installation, Commissioning, Operation & Maintenance, and on-site Comprehensive Warranty for a term of ten years, Rajasthan Electronics & Instruments Limited (REIL) has announced a tender. This is to set up EV charging stations at New Delhi’s NDMC locations.
The online bids will close on May 9, 2024, and the bid opening will take place the next day.
At the now, REIL has eight locations in the NDMC, New Delhi, with the possibility of gaining access to about a hundred more.
The scope of work includes Location Survey & Identification, Planning, Supply, Installation, Commissioning, Operation & Maintenance, and on-site Comprehensive Warranty for 10 years, aimed at establishing EV Charging Stations at NDMC sites in New Delhi.
The Bidder is responsible for ensuring the deployment of qualified and suitable manpower, along with the necessary tools, logistics, spares, and consumables throughout the supply, installation, commissioning, and O&M phases of EV charging stations or any related infrastructure developed under the agreement for 10 years from the agreement’s signing date.
The Bidder must have achieved a minimum annual turnover of at least 43,20,000.00 in the preceding three financial years up to the bid opening date, and the company’s net worth in the last financial year (2023-24) must be positive.
The Bidder must demonstrate experience in completing orders for the Supply, Installation, Testing, and Commissioning (SITC) of EV chargers, which have been operational for at least one year. Within the last 7 years before the bid submission date, the Bidder should meet one of the following criteria:
- a) Three orders of SITC of EV chargers totalling not less than 40% of the Total estimated value, i.e., 57.60 lakh rupees for the type of EV charging equipment.
- b) Two orders of SITC of EV chargers totalling not less than 50% of the Total estimated value, i.e., 72.00 lakh rupees for the type of EV charging equipment.